Construction project of a solid waste Plant in Valencia. Technical Direction to the geotechnical campaign. (Spain) Print E-mail
Experiences - Civil Engineering Projects

Project for the tender process and construction of the New Solid Waste Plant of Valencia. It includes the design of 7 buildings with an area of about 60,000 m2, and the site development of an approximate area of 100.000 m2.

The industrial project designs the complete process of treatment, including:

     Tunnels composting
     Bio-methanation
     Cogeneration
The project is based on ecological, environmental and sustainability criteria.

 hornillos

Location

Valencia

Client

Joint Venture Los Hornillos

Year

 2005 - 2007

 

 
Enlargement of the sewage treatment plant of Algorós located in Elx (Alicante, Spain) Print E-mail
Experiences - Civil Engineering Projects

The defined works consist of the alteration and enlargement of the wastewater treatment by anaerobic digestion guides for a design flow of 38,000 m3/day, with nutrient removal and advanced tertiary treatment for wastewater reuse for irrigation.
WATER LINE: PRETREATMENT + NUTRIENT REMOVAL ACTIVATED SLUDGE PROCESS+ TERTIARY TREATMENT
MUD LINE: ANAEROBIC DIGESTION PRETREATMENT+DEHYDRATION+COGENERATION
The work was developed as technical office support for work performed, with development of detailed engineering and resolution of the various construction problems raised at the installation in service without compromising the quality of the effluent during construction.
Technical support, the selection equipment and support of the implementation of the works, were the provided services to the construction company during the installation design.

             dep

Location

Elx (Alicante)

Client

Valencia Regional Governement for Infrastructure and Transports

Year

2006

 

 


Banner
Banner